Today I anchored the north side of the lower tier alcove bridge, then put down the rest of the track:
If I have time I'll start on the wiring tonight. There are approximately 25-30 pairs of feeder wires to hook up. I think if I had dedicated time I'd probably average about 6-9 pairs per hour, but usually I get only short windows of time to do layout work, so I'm not sure how long it will take.
I have now used up all my Atlas code 80 flex track stock and have very few switches (2) and rerailer tracks (7?) left. I'll need to order more in order to finish the hidden layout track that connects to the middle tier, so I should make a point of sending out a track order in the next week or so.
Tuesday, January 19, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment