More track laying today, I now have completed the lower tier staging through the remaining switches:
The various boxes lying on the track are used as flat weights to hold the track in place while the glue dries.
Getting close to done with the lower tier. I have a little bit of woodwork to do at the north end of the alcove bridge (currently that side is supported by a lone nail, it needs to be properly anchored), and a little bit more track to lay to connect the lower tier with the main layout. After that I'll wire the new lower tier track. At that point it will be ready for cleaning and once again running trains. Target for running trains again is still Saturday. The wiring task is takes a lot of time.